{"id":983,"date":"2012-11-17T11:54:35","date_gmt":"2012-11-17T15:54:35","guid":{"rendered":"http:\/\/www.oxebridge.com\/emma\/?p=983"},"modified":"2012-11-17T11:54:35","modified_gmt":"2012-11-17T15:54:35","slug":"puch-manufacturing-advances-to-as9100","status":"publish","type":"post","link":"https:\/\/www.oxebridge.com\/emma\/puch-manufacturing-advances-to-as9100\/","title":{"rendered":"Puch Manufacturing Advances to AS9100"},"content":{"rendered":"<p>Orlando FL &#8212; <a href=\"http:\/\/www.puch.com\" target=\"_blank\">Puch Manufacturing Corp<\/a>, a contract manufacturer of machined products for aerospace and other industries, has updated its quality management system to comply with AS9100 Rev C.<\/p>\n<p>Puch was an ISO 9001 client for Oxebridge from 2004. In developing the new AS9100 system, Oxebridge worked with Puch management to streamline the QMS, while bringing it into compliance with the aerospace quality system standard.<\/p>\n<p>Oxebridge also assisted Puch in obtaining grant funding for the AS9100 implementation, through Workforce Florida.<\/p>\n<p>Puch has selected <a href=\"http:\/\/isoqarinc.com\" target=\"_blank\">ISOQAR<\/a> as its AS9100 registrar, and an audit is scheduled for late November 2012. ISOQAR is accredited by ANAB to conduct AS9100 compliance audits.<\/p>\n<p>For more information on Puch Manufacturing, visit <a href=\"http:\/\/www.puch.com\" target=\"_blank\">www.puch.com<\/a>.<\/p>\n<p>For more information on Oxebridge&#8217;s Rapid AS9100 Implementation program, click <a href=\"http:\/\/www.oxebridge.com\/emma\/?page_id=138\" target=\"_self\">here<\/a>. For for information on possible grants to fund AS9100 implementation, <a href=\"http:\/\/www.oxebridge.com\/emma\/?page_id=72\" target=\"_self\">contact Oxebridge<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Orlando FL &#8212; Puch Manufacturing Corp, a contract manufacturer of machined products for aerospace and other industries, has updated its quality management system to comply with AS9100 Rev C. Puch was an ISO 9001 client for Oxebridge from 2004. In developing the new AS9100 system, Oxebridge worked with Puch management to streamline the QMS, while [&hellip;]<\/p>","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","mc4wp_mailchimp_campaign":[],"footnotes":""},"categories":[3],"tags":[15,87],"class_list":["post-983","post","type-post","status-publish","format-standard","hentry","category-news","tag-as9100","tag-rapid-as9100","et-doesnt-have-format-content","et_post_format-et-post-format-standard"],"_links":{"self":[{"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/posts\/983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/comments?post=983"}],"version-history":[{"count":1,"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/posts\/983\/revisions"}],"predecessor-version":[{"id":984,"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/posts\/983\/revisions\/984"}],"wp:attachment":[{"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/media?parent=983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/categories?post=983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oxebridge.com\/emma\/wp-json\/wp\/v2\/tags?post=983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}